Skip to main page content

Operational efficiency in newly regulated sectors

caso eda

The challenges of newly regulated companies

Like other recently regulated national public companies, EDA – Electricity Company of the Azores, SA, faces a challenge of profound transformation, driven by community directives for the separation of activities (“unbundling”) and the process of partial privatization.

Additionally, the objective of ensuring that revenues are sufficient to support operating costs becomes more complex with the need to comply with the Tariff Regulations, imposed by ERSE – Energy Sector Regulatory Entity, which limit the evolution of the tariff – conditioning the evolution of revenues (via energy prices) as well as costs accepted for regulatory purposes. Taking into account the rigidity of demand elasticity, as well as the limitations that derive from the socioeconomic impacts of energy use, entities in the sector will have to respond to these challenges through significant gains in operational efficiency and cost reduction and through innovation strategic in the provision of services and in the macrostructure of the sector.

In the case of EDA, these challenges are increased by the implications of insularity. The geographic context of the Azores, which requires the production and distribution of electricity on the nine islands of the Azores archipelago, leads to the dispersion of support services and production centers, making it difficult to obtain economies of scale. This effect is widely noticeable in terms of costs with the Supply of External Services (FSE).

Respond to the regulator

The aforementioned constraints forced the company to develop a set of actions that would allow it to respond even better to the challenges posed by the regulator:

  • Reduction of direct costs;
  • Alignment of the tariff (in relation to the tariff in force on the mainland);
  • Establishment of a cost allocation model based on activities (ABC method); It is,
  • Redesign of production procedures.

Additionally, aware that there were opportunities to reduce indirect costs, the EDA Board of Directors decided to move forward with a program to reduce these costs, according to the PRICE methodology – Immediate Exploration Cost Reduction Program – developed by LBC.

Implementation

The first phase of EDA’s indirect cost reduction program, of an experimental nature, focused on communication costs (voice and data), hygiene and cleaning services and car fleet costs. Altogether, these three items total around 40% of the company’s External Service Supplies costs.

The first phase of the program resulted in a set of 16 recommendations that led to an estimated reduction of around 13% of the analyzed value. These recommendations were based on diverse activities such as centralization of contracts, rationalization of consumption and redefinition of internal procedures.

Additionally, a set of recommendations for the strategic development of the supply area was defined, namely:

  • Development of strategic sourcing initiatives – Negotiation of contracts at central level and operational management at local level;
  • Improvement of supplier management – ​​Assessment of services and regular market consultation;
  • Invests in leveraging technologies through an electronic purchasing program.

Due to the results obtained, it is planned to continue EDA’s indirect cost reduction program, which includes the application of the PRICE methodology to other cost items for the Supply of External Services and the development of market consultations in conjunction with other regional companies of similar size.

Presentation of EDA – Electricidade dos Açores

EDA – Electricidade dos Açores, S.A., created in 1980, has as its main objective the production, acquisition, transport, distribution and sale of electrical energy throughout the Azores archipelago. The company is majority owned by the Autonomous Region of the Azores, with part of its share capital being ESA -Energias e Serviços dos Açores, SGPS, SA and EDP Participações.

The company – one of the three largest companies in the Archipelago – is present on the nine islands that make up the Azores archipelago. EDA holds a group of five participating companies:

  1. EGG – exploration of hydro and wind power plants;
  2. GeoTerceira – exploration of the geothermal power station on Terceira island;
  3. GlobalEDA – management of telecommunications resources and information systems;
  4. SEGMA – maintenance services; It is,
  5. SOGEO – exploration of geothermal plants on the island of S. Miguel.

Restructuring of CTT’s third-party networks

ctt

Context of development of third-party networks

Distribution networks are increasingly decisive for the success of various types of business, as they represent the most decisive interface for contact with the customer. “One size fits all” distribution network management solutions bring benefits as they allow you to operate on a large scale, homogenizing operational processes, simplifying the management process and reducing costs.

However, they are not always the most appropriate considering the necessary investments, especially in situations where interaction with the customer is more decisive for the business than the efficiency of the back office. In these cases, in order to reconcile the two factors, it is necessary to adopt more complex solutions, evaluating all business variables.

In order to rationalize its operating costs and boost activity revenue, the CTT Group analyzed the strategic and operational development options for current third-party networks: post offices and PayShop, counting on the support of LBC for this purpose. The post office network is complementary to the post office network. PayShop’s network of agents is dedicated to exploring the over-the-counter bill payment and prepaid cell phone top-up market.

These networks have different growth matrices, different functions and importance in the universe of services provided by the CTT Group and in terms of the public postal network development agreement presented to the regulator, but they have the potential to obtain synergies and greater mutual coordination, especially with regard to the postal collection service.

Strategic and operational challenge

In this way, the CTT Group was given the possibility of adopting a “one size fits all” model, integrating third-party networks in technological, procedural and contractual terms, or embarking on the segmentation of networks according to customer needs, types traffic and types of services to be provided.

Some decisive questions for decision-making were analyzed:

  1. Progressive autonomy of procedural and financial management of third-party networks from the current own network of post offices;
  2. Technological homogenization of networks, using the same platform to support operations;
  3. Centralization and coordination of management and reporting of third-party networks in a single entity within the CTT Group.

Faced with the challenges of efficiency/effectiveness and the need for customer service, it was necessary, whatever the solution adopted, to have an integrated approach, ensuring the necessary synergies for the CTT Group.

Targeting

The different strategic and operational development options were, therefore, considered and analyzed based on several aspects: Strategy, Technology, Regulation, Contracts, Brand and Communication, Processes, Human Resources and Economic and Financial. A segmentation of the third-party network was also developed into 4 fundamental aspects:

  1. Geographic coverage;
  2. Regulation and contracts;
  3. Business (in terms of traffic carried out);
  4. Computerization (existence and type of solution).

Customized solution to customer needs

The segmentation carried out allowed us to find different solutions for the third-party network, depending on the different needs of each segment.

In the segment of stations with lower traffic volume, it was decided to maintain the current situation, without an associated technological solution, as the potential investment to be made was not offset by the incremental benefits.
In the segment of stations with a volume and traffic mix more focused on postal charges, the solution consisted of investing in computerization, through the installation of Point of Sales (POS) equipment with a PayShop optical reader, assuming the necessary developments to increase the functionalities of the equipment and interfaces with CTT systems, with an annualized value of more than €350.000.

For post offices with greater traffic and a greater mix of traditional mail services, a more complex technological solution was defined for the management of postal services (currently also present in Post Offices), allowing for better service provision and speed in transactions at these post offices.

Simplification

Actions were also defined that lead to the harmonization of payments for services provided in the third-party network, through solutions that allow a win-win solution for the CTT Group and for the various agents in the third-party network.

In terms of backoffice, mechanisms were defined to simplify various activities at post offices linked to checking the work of post offices, entering data into the system and carrying out accountability, assuming the change of processes.

Additionally, there is a potential increase in post office revenues, induced by the increase in mobile phone charging operations with an interest in the traffic generated for the external network agent.

These improvements result in a potential for increased revenue and cost rationalization which, in view of the investment, allows for annual value creation potential of around 1 million euros to be achieved.

Conclusions

Some lessons can be drawn from this investment decision by the CTT Group, in the sense of:

  1. Guide investment decisions primarily by the objective needs of clients, and not by the offer of services or any other criteria;
  2. Avoid massive investments in technology, without the respective profitability component, either through cost rationalization or increased revenue;
  3. Analyze the distribution network in an integrated way, avoiding potential channel conflicts and focusing on providing service to the end customer.

 

Systematized organizational communication makes a difference

comuncacao organizacional

Knowledge management

The initiative developed by CP – Comboios de Portugal allows us to conclude that, as long as it is developed with an innovative approach that reaches all employees, an Organization Manual can be an important management tool, especially in terms of reinforcing an organization’s culture.

It is now a consensus that knowledge, being just a click away, is the basis for the development of any business. However, the fact that an organization has knowledge (technical, management, etc.) is not, in most cases, the only condition for success. It is essential that each organization intelligently manages this knowledge in order to enhance the individual performance of its employees and teams and, consequently, its corporate performance.

In large organizations, with great geographic dispersion or that have undergone profound processes of internal transformation, the business challenge lies, in addition to aspects of a commercial nature, in the ability to create its own identity, a reference, that mobilizes and involves everyone employees around a common culture and objectives.

It was in this context that the CP established the objective of developing the CP Organization Manual, an element considered fundamental to centralize and manage knowledge relating to the CP Organization.

New organizational logic

This initiative was not intended to carry out any organizational restructuring or carry out a profound reformulation of the responsibilities and scope of action of each area. At that time, CP was in the implementation phase of a new organizational logic at the level of its central bodies, which included the creation of a Corporate Center (oriented towards defining policies and strategic guidelines) and a Shared Services Center ( oriented towards execution and providing transversal support to the entire company). CP’s organizational structure also includes a set of business units dedicated to specific business segments.

However, more than compiling information on the organization chart or the description of the responsibilities of the respective organizational areas, this initiative aimed to create a reference instrument in the company. The objective of the CP Organization Manual was:

Provide, in an integrated and dynamic manner, relevant information for the development of the CP organization, including a standardized description of the responsibilities of each organic unit;
Promote the use of the Manual as a fundamental element in each employee’s individual perception of their role and their contribution to the company’s global objectives;
Strengthen the internal culture and speed up the operationalization of the strategy by encouraging the active participation and involvement of all employees.
To this end, it was assumed that it was essential to make the document available on various media, physical and digital, with different objectives, content and target audiences (internal and external to CP), which constituted an innovation in relation to the traditional approach to document development of this nature.

Content creation

It was considered extremely important to ensure that the contents were:

  1. clear and objective;
  2. practical (action-oriented);
  3. permanently updated;
  4. easy to access and navigate.

Assuming these assumptions as the basis for the development of any document formats.

There was specific work in terms of aligning the manual with all other documents and systems implemented and to be implemented, ensuring the consistency and complementarity of its contents.

Different formats of the organization manual

Effectively, the contents of the manual were developed in line with the company’s strategy, the statutes and legislation applicable to the company, with the quality and process manuals, among others.

Thus, it was possible to develop an aggregating document and not a traditional organization manual, generally isolated from the other structural documents of an organization.

Other determining factors for the success of this CP initiative were the focus on bold graphics, linked to the CP identity and focused on conveying key messages, and the active involvement of the various organizational areas, both in terms of deepening the basic concept of each of the formats, whether in terms of production and/or validation of the content made available.

As an example of some details that made a difference, we highlight the news banner created in the intranet version, whose objectives were to create an appetite for regularly consulting the CP Organization Manual through the provision of important news from the company’s daily life .

Reach multiple target audiences

Also the possibility of the various target audiences being able to absorb the CP organization’s key messages in a short space of time, in any of the formats produced, was determined to be decisive for the success of this initiative.

In addition to the concept definition and the conceptual model of the CP Organization Manual, the project involved a strong communication component, materialized through presentations and newsletters, which proved to be decisive in absorbing the added value of a document of this nature by the organization. majority of employees.

This CP initiative, due to the dynamics created, worked as an important exercise in organizational consolidation. However, practical results may have reduced impact in the medium term if they are not continued. According to Dr. Cristina Dias, Director of Organizational Development and Change Management at CP, “Providing an integrated view of the company online, the CP Organization Manual is today a work tool that systematizes global knowledge of Comboios of Portugal and its activities, contributing to its alignment in the construction of a common vision of excellence in the service provided and full customer satisfaction.”

Reinforcement of the initiative

“With the partnership between Comboios de Portugal and LBC and the professionalism of their teams, this work instrument was created which from the outset motivated the involvement of all employees due to the added value it represents in carrying out their duties”, says Cristina Dias.

That is why it is CP’s objective to take advantage of this dynamic to reinforce organizational discipline and the company’s culture. In this context, a set of initiatives are already underway/planned around the CP Organization Manual, which will certainly reinforce the impact of this initiative, namely:

Critical review of the contents of certain organizational areas in order to ensure their best suitability;

Evolution of the intranet version, taking the form of a portal dedicated to Organizational Development and Change Management, covering aspects related to strategy and its respective monitoring.

Objectives of an organization manual

I. Assume the organic structure as the engine for achieving performance objectives:

  • Assume the organizational structure as a means to achieve the vision, mission and business development strategy;
  • Relate the efficiency of functioning and coordination between the units of the structure with the efficiency with which the organization develops and achieves its objectives.

II. Clarify the organic and relational structuring of all areas of the organization’s activity:

  • Understand the macro and micro organization of all activities that daily produce the service offered to the customer by the organization;
  • Clarify the relationship dynamics that are established – macroprocesses and internal supply dynamics.

III. Integrate the systematization of the functional contents of all units of the organization into a single document:

  • Ensure that a single document integrates the functional descriptions of all units of the organization, gaining a global view of all the organization’s activity, in its fundamental aspects;
  • Start a path towards standardization, creating a single language to describe identical activities.

IV. Clarify scope and limits of intervention

  • Clearly describe the main responsibilities of each area of ​​activity, clarifying interdependencies and avoiding replications.

Post office in Angola modernizes

correios angola

Wide range of opportunities

The fundamental elements of the model are the pragmatic identification of the market’s potential, the objective identification of service gaps and an operational focus (acting with determination and restructuring with courage) in the areas of greatest business potential, based on a succinct plan of action, of training and investment. Afterwards, the quality of management and daily leadership will be decisive.

Company Correios de Angola It is part of an extremely dynamic and promising emerging market, characterized by high rates of economic growth, a substantial increase in new economic activities, which result in new needs for the production of services and, naturally, produce a wide range of new opportunities.

1. Turnaround in progress

However, to take advantage of this potential, Correios de Angola needs to overcome several complex challenges, among which the following stand out: physical infrastructure destroyed by the war, with a high cost of rehabilitation; prolonged period of lack of operational and organizational modernization and technological innovation, which resulted in the crystallization of less productive operational processes; disuse of mail by the market, due to the war situation, now complemented by the increasing use of new technologies, namely mobile phone and Internet; little orientation of the company towards the market, and consequent irregularity in the level of service provided, due to the long period of economic constraint; chronic economic and financial deficit of the company, due to the previous items and the universal service commitments to the populations.
However, as a result of the ongoing modernization process, Correios de Angola is successfully overcoming these challenges, offering the market a set of new quality services, with greater speed, reliability, security and increasing geographic coverage. . The range of new services and the quality of the service offer will increase significantly over the next two years. The offer of new services for the business market, the inauguration of new stations, now offering Internet access, the new website, and the ongoing computerization of several post offices, a project contracted to CTT in Portugal, are already visible results.

2. Model on the basis of modernization

The model that supports this new dynamic is based on the combination of the following actions:

  • Initial commitment by the political tutelage and the National Directorate of Posts;
  • Definition of a master plan for the postal sector with a clear vision of the future, drawn up by KPMG;
  • Orientation of the Correios de Angola company towards the services that the market, its customer base, most needs.

LBC is supporting Correios de Angola in this last aspect, called “Programa Destaca”, both in conceptual terms and in terms of support for implementation, while also supporting its strategic update.

The methodological approach defined for Correios de Angola was based on the fundamental concepts of strategic marketing:

  1. identify potential market value and business potential;
  2. segment the market;
  3. identify customer expectations;
  4. identify the service provision gap of Correios de Angola; and
  5. define a pragmatic and competitive service proposal in relation to the competition, which allows the satisfaction of customer needs and the creation of value for Correios de Angola.

This last point required the definition of a new operating model for the company.

An overriding objective of the work was to increase the volume of traffic in conjunction with other measures, in order to allow a lasting economic and financial sustainability in the Correios de Angola company, reducing the need to inject public funds into the company for the operational component , thus building capacity to better contribute to the country’s socio-economic objectives and to provide services to needy populations.

The “Programa Destaca” combines an intervention with both a strategic and an operational focus to revitalize the business in a quick and objective way, including the following elements:

I) Strategic:

  • Identification of areas with the greatest business potential;
  • Identification of the causes (internal and external) of service gaps;
  • Identification of business development levers;
  • Valuing the options to be taken in terms of impact and cost;
  • Quantification of the total value generated by the actions to be developed, ie, “Programa Highlights”;
  • Identification of partners for better development of new services.

II) Operational:

  • Definition of operational actions for the “Programa Destaca”;
  • Definition of those responsible for carrying out the actions;
  • Definition of the intervention schedule;
  • Definition of the monitoring model.

The achievement of the ambitious objectives by Correios de Angola will be a gradual process, but which will fundamentally depend on its own ability to approach customers with value offers and to reposition itself in terms of image, reinforcing confidence in the company among the public. market.

3. Strategic and operational objectives defined by Correios de Angola

The Destaca Program involved a previous update and a framework in the action strategy of the company Correios de Angola in the period 2007-2012, which will be guided by 4 strategic axes, aiming to ensure a stronger and more dynamic presence in the market and a new corporate image.

The proposed strategic investments for the period 2006-2008, necessary to reinforce the activity of Correios de Angola, focus on 3 areas:

  1. Training of Human Resources;
  2. New Services and Improved Operations;
  3. Recovery of the Postal Network.

strong involvement

Inserted in this context, the Destaca Program was structured around five lines of action and a set of 15 priority actions, which, when combined in a coherent way, will allow to obtain significant results in the short term.

For Vítor Calhau, Country Manager of LBC in Angola, the complexity of putting this whole set of actions in the Destaca Program into operation requires a strong involvement of the structure and key people, the reinforcement of management and leadership skills, as well as a great sense of practical implementation.

Innovation in relationship management pays off

gestao relacionamento

Take advantage of synergies

The case of Cascais City Council, recognized with a Good Practices award within the scope of the Digital Local Authorities Program, shows how the basic conditions for an Administration closer to the Citizen should be created, due to the innovation and comprehensiveness of the approach.

The development strategy for the Beira Interior wine sector was defined, including the business plan, an analysis of the five cooperative wineries (in terms of market development, rationalization of production and improvement of viticulture). And the Joint Purchasing Center of Beira Interior was created (which involved the characterization of the purchasing function, the action plan, and support in the preparation and follow-up of the first purchase).

The project, whose works were carried out over four months, was based on taking advantage of synergies between the agents, including the sharing of resources, the increase of critical mass in the supplier and customer markets and the definition of joint strategies to address the market in commercialization and promotion of wines. Based on the model proposed by LBC, competitive positioning within UNACOBI and against the best competitors in the market was carried out, while strategies were implemented to bring Beira Interior closer to best practices.

In the first phase, relevant information was collected from the five UNACOBI associates (the cooperative wineries of Covilhã, Figueira Castelo Rodrigo, Fundão, Pinhel, and the Cooperativa Agrícola de Beira Serra), which included more than 50 interviews with those responsible top management, as well as gathering management information and analysis of the financial statements.

A benchmarking of international experiences and success stories in Portugal was carried out, as well as a wide survey of distribution channels (which made it possible to ascertain the value of products and key purchase factors). The goal? – Develop and coordinate the joint actions of the wineries to make Beira Interior the wine region of the Beiras with the highest growth rate in bottled sales, reach the category of “Region” in the national market and be a national reference in the internationalization of wines.

Strategic goals and operational objectives

The project was supported by strategic goals and operational objectives in a phased manner in order to position Beira Interior at the top of the regions in Portugal, and to consolidate the penetration of wines from the region at an international level. 17 operational objectives were defined in four areas of intervention and a set of 16 indicators to measure the success of the operationalization of the strategy.

One of the goals was to reinforce the reputation of the region’s wines through a commitment to effective marketing, with a 10% increase in investment in sales promotion (based on the international benchmark for quality wines). Institutional initiatives involved, for example, the inclusion of wine and activities related to the wine sector in local tourist routes and routes through the articulation between municipalities, the Tourism Region of Serra da Estrela and tour operators.

 

Public procurement action plans – modernization levers

compras publicas

Increased efficiency and transparency…

The purchasing function has a huge impact on public expenditure and public administration bureaucracy, meaning its optimization has assumed preponderance with regard to State modernization policies. The project to modernize the purchasing function of Cape Verde’s public administration is one of the key factors in State reform. In this context, the Electronic Public Procurement Program (PCPE), adopted and developed with the support of, establishes an integrated purchasing strategy, which makes it possible to achieve the effective modernization of the purchasing function, increase transparency and equal opportunities, achieve greater rationalize expenditure and obtain efficiency gains.

The estimated savings calculated – assuming the adhesion of all Ministries – will lead, in addition to increases in the efficiency and transparency of the purchasing process, to a potential savings of between 136 and 309 million CVE per year, resulting from the implementation of the strategies purchase terms defined for each category of goods and services, which promote the best market conditions (combining quality and price). This savings potential corresponds to between 1% and 2% of total State expenditure on goods and services, based on 2007 values.

…and competitiveness

The PCPE will also promote the modernization of the business fabric and increase the country’s competitiveness, through the promotion of measures that promote the development of companies, their e-inclusion, the training of their resources and the promotion of their adherence to the initiatives provided for in the PCPE .

The adherence of companies to the electronic purchasing modality and tools will allow the development of two phenomena. The increase in the market potential of companies by having more transparent and easy access to business opportunities and by getting closer to potential customers (universalization of information) and the increase in the level of market competitiveness, derived from greater access to business opportunities, inducing an increase in the quality and quantity of proposals that results in more appropriate solutions being made available to the Public Administration, and under the best conditions.

Targeted action plan

However, there are several challenges associated with the modernization of the purchasing function, which is why initiatives to aggregate needs and centralize negotiation, dematerialize processes, use electronic means of negotiation and transactions, among others, must be promoted; However, there is certainty that the real benefits and savings achieved result from the ability to implement the solutions, which presupposes the existence of a successful action plan.

In this context, the recognition of the importance of defining a targeted action plan, capable of guaranteeing the operationalization of the established strategy, emerged naturally. With this growing awareness, the action plan presents itself as a fundamental instrument for managing change, accountability and monitoring the ability to execute activities and set results, being an essential tool for the project’s Project Management Office (PMO).

In view of the above, the Public Procurement Action Plan is a true lever for the modernization of Public Administration, as it is an effective instrument for transposing the challenges of the procurement function in the public sector (see Box 1) and an effective means of addressing the critical success factors associated with the implementation of the national purchasing strategy.

Challenges of purchasing in the public sector

  1.    The predominance of bureaucratic procedures, differentiated and highly complex and slow;
  2.    The deficient qualification of agents responsible for conducting public procurement processes;
  3.    Poor administration of the processes for acquiring goods, services and public works;
  4.    Ineffectiveness in the management of public contracts; It is
  5.    The absence of adequate mechanisms that guarantee transparency and rigor in the conduct of public procurement processes.

The General Directorate of State Heritage (Ministry of Finance) ensured the conceptualization of the action plan based on solid and sustainable principles capable of guaranteeing the success of its implementation.

Additionally, it was the concern of the General Directorate of Heritage of Cape Verde to disaggregate the main activities of the plan into tasks and index them to:

  • responsible;
  • execution deadlines;
  • necessary means;
  • indicators (of execution and results); It is
  • possible constraints and contingency actions.

It should also be noted that one of the characteristics of success is the complementary existence of a monitoring component, which facilitates decision-making and speeds up the implementation of corrective, preventive and improvement actions, contributing to minimizing risks and maximizing success.

In addition to being a PCPE operationalization tool, the monitoring component is also a communication instrument capable of mobilizing key stakeholders around a common objective – making the purchasing function of Cape Verde’s public administration more effective and efficient and contributing to the modernization of public administration.

Critical factors of modernization

  1.    Political sponsorship and project leadership, associated with a strong body – normally the Ministry of Finance – are indicated as determining factors;
  2.    The definition of goals allows for greater effectiveness in monitoring their execution and impacts;
  3.    The standardization and harmonization of procedures are considered fundamental for appropriating the gains from modernizing the public procurement system;
  4.    The integrated technological model should function as support for public purchases and allow interoperability and integration with other Public Administration and business systems;
  5.    The support of the business community in adopting ICT is crucial to boosting gains and ensuring harmonization of access;
  6.    In less developed markets, political instability and pressure from some market players have generated setbacks in the modernization of public procurement, which must be mitigated;
  7.    The training of public servants, in terms of procurement and adoption of new technologies;
  8.    The development of change management programs – particularly in terms of project dissemination and mobilization of stakeholders – is also considered an essential aspect for project performance

 

Know first, act later

grupo berger

“Photography” of the organization

All actions carried out on the organizational structure of companies, as well as on the people who compose them, touch the most sensitive parts of organizations. In this sense, it is vitally important to address these actions by previously analyzing the organizations, the workers’ perceptions and where they intend to go.

Otherwise, actions carried out at random or not in line with reality will hardly translate into concrete and expected results.

LBC carried out an Organizational Climate Study project at Bergé Automotive Logistics (BAL), with the aim of getting to know the reality of the organization involving the central offices and various logistics centers spread throughout Spain.

The aim of the project was to take a “photograph” of the organization in terms of the work climate and the satisfaction of all employees, as a basis for future organizational and human resources actions.

Project execution

This exercise demonstrated that, for BAL, the application of the corporate strategy necessarily involves this knowledge of the reality that the company lives in its different aspects. The company understands that only based on the reality perceived by employees can corporate policies and strategies be properly implemented to achieve the results that the market and the company demand. The execution of the project was characterized by the following aspects:

  • Investigation of the working climate according to different areas of assessment: training, motivation, performance, communication, collaboration, customer orientation and working environment/conditions;
  • Segmentation of employees according to the Work Units that make up the BAL, to obtain a firmer view in the subsequent analysis;
  • Commitment of BAL’s management to communicate the project in all its phases in order to achieve the adherence of all people to the exercise, including the subsequent communication of results. This aspect was important for the participation of employees, as an exercise of proximity between management and operation, and as a show of commitment, providing credibility to a vital project for the articulation of subsequent actions;
  • Linking the results to an articulated planning of short, medium and long-term improvement actions, which were communicated in a clear and transparent manner to the entire organization at the end of the project;
  • Linking planned actions to: tasks to be carried out, associated deadlines, responsible persons, results to be obtained and indicators for monitoring these results.

 

Angola at the forefront of electronic public procurement

angola compras publicas

One of the pillars of this reformist purpose is Public Procurement, as a reflection of the Government’s concern in the effectiveness of the management of public resources and in increasing the transparency of their use, which, integrated with other ongoing reformist initiatives, will result in a relevant volume of savings and better allocation of these resources in more initiatives to modernize and improve the functioning of the Public Administrative System or in economic and social initiatives.

In this context, the Government of Angola began an ambitious project to modernize public supply through the design and implementation of a National Electronic Public Procurement Program (PNCPE).

The PNCPE is a master plan for the modernization of Public Procurement, having two main practical references regarding the ultimate objectives to be achieved:

  • Administrative modernization of Public Procurement, based on the establishment of centralized sourcing and negotiation strategies, the redefinition of the organizational and functional structure affecting Public Procurement, the modernization of its legal framework, as well as the training of human resources allocated to this area; It is
  • Technological modernization of Public Procurement, through the definition of an integrated technological model that is transversal to the State apparatus, and through the adoption of the business sector to electronic tools to support the procurement process.

Unique opportunity

The development of the National Electronic Public Procurement Program constitutes a unique opportunity to achieve a set of high-level purposes that will not only place Angola on an internal level of innovation and modernity, but will also contribute greatly to promoting the image and dynamism of the country to international level.

The PNCPE design work, which had the support of LBC, included an analysis of international reference cases, including working visits by the Ministry of Finance team to some entities in Europe and South America. of international realities related to similar initiatives, together with the characterization of the profile of Angolan public expenditure in recent years and the challenges expected for the future, allowed the following set of strategic objectives to be established.

Aware of the importance of economic agents adhering to this initiative, the PNCPE has incorporated a set of measures to promote the info-inclusion of companies, with a special focus on small and medium-sized Angolan companies, aiming to promote electronic commerce, its competitiveness and productivity of the economy in general.

Due to the innovation introduced by PNCPE and the expected impacts, a pilot phase will take place until 2010 in a group of 10 Ministries where the planned projects and actions will be implemented in a restricted set of categories of goods and services (Proof of Concept).

During this implementation, the impacts will be analyzed and opportunities for improvement will be identified to be introduced in the strategic review of the document, scheduled for 2010 – which envisages the generalization of the Program to the Central and Provincial Administration and the State Business Sector.

Benefits achieved

Among the test implementation initiatives already carried out, we highlight the carrying out of a set of procedures, which will allow savings of around 7,86 million USD to be achieved.

These potential benefits are essentially due to the combination of two effects: aggregation of needs and comparison of potential suppliers with a more open, more transparent and simplified tender process, which together resulted in a considerable improvement in the State’s negotiating power.

These procedures have been carried out through the Angolan e-marketplace “TradeJango”, a platform that supports purchasing processes electronically.

In addition to these quantitative benefits, there has been permanent involvement of staff from the Ministries involved in this process in order to train them on new public procurement concepts and procedures.

Critical Success Factors

  • Obtaining strong – and continued – political sponsorship for the implementation of the PNCPE;
  • Implementation of initiatives in a timely manner, according to the defined schedule;
  • Promotion of inter and intra-organizational cooperation, particularly with regard to trade, employment and information technologies;
  • Program management of projects foreseen in the PNCPE, as well as the respective monitoring of the results achieved;
  • Ensuring that the benefits are measured accurately, in order to diagnose the success of the initiative;
  • Effective communication from PNCPE.